Previous
Next
Project Description
The new functions coming to construction for equipment mathematics promise make life easier for owners and equipment managers. Sure, they’re reducing waste and lowering costs, but the real transformation on the horizon is one where advanced streams of data combine to create entirely new ways managing machines.
There are some big shifts taking place in the field of construction equipment mathematics. with the mathematics devices in vehicles right from the manufacturers, to the standardization and integration of mathematics data across various business functions.
- Installation of final floor covering, such as floor tile, carpet, or wood flooring.
- Building inspector visits if necessary to approve utilities and framing.
- Excavate the foundation and dig footers Scope of work is dependent of foundation designed.
- If required obtain approval from HOA (homeowners association) or ARC architectural review committee.
- Cover outer walls and roof in OSB or plywood and a water-restive barrier.
- Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backslash
Related Projects
-
Oil & Gas
Villy Manufacturing Inc
Project Details
- Client Name : Kyle Frederick
- Budget : $100000
- Categories: : Construction
- Completed: : 2018
- Area: : 450,000 m2
Brochures
Headquarter
- 10700 World Trade Blvd Suite 114 Raleigh, North Carolina 27617
- info@agilitytrans.com
- (919) 899-9119
- Mon-Fri: 7am to 7pm